Capital Improvement Program

MPWD Comprehensive System Analysis

The Comprehensive System Analysis and Capital Improvement Program FY 2016 – 2017 Update is now available for download (PDF), including Appendix A - Capital Improvement Program Summary (pp. 27-30) and Appendix D - Asset Management Analysis ‐ Water Mains (pp 31-33). Appendices B & C, which include detailed analyses and schematics for each program, are available upon request at the District office at 3 Dairy Lane, Belmont, CA 94002 during business hours, Monday-Friday.

View PDF »


Informational Summary of Board Discussions and FAQs

The Informational Summary of Board Discussions and FAQs (Frequently Asked Questions) for the Proposed Capital Improvement Program (CIP) and Potential Options for Financing is now available for download (PDF). Includes the 2015 Capital Assets Audit (p. 9), Debt and Payoff Samples (pp. 10-15), Resolution No. 2016-16 – Adopting MPWD Comprehensive System Analysis and Capital Improvement Program FY 2016-2017 Update, and Authorizing MPWD 5-year Capital Improvement Program for FY 2016/2017 through 2020/2021 (pp. 16-17), and Exhibit A – 5-year Capital Improvement Program FY 2016/2017 through 2020/2021.

View PDF »


Resolution No. 2016-06 (CIP)

Resolution No. 2016-06 – Adopting MPWD Comprehensive System Analysis and Capital Improvement Program FY 2016-2017 Update, and Authorizing MPWD 5-year Capital Improvement Program for FY 2016/2017 through 2020/2021 is available for download (PDF).

View PDF »


5-Year CIP Detail

Exhibit A of the 5-year Capital Improvement Program FY 2016/2017 through 2020/2021 is available for download (PDF).

View PDF »


Alameda de las Pulgas Water Main Replacement

The existing 6 inch and 8 inch cast iron pipe (CIP) water mains along Alameda de las Pulgas between Cipriani Boulevard and Arbor Avenue were installed in the mid-1950s and have experienced numerous water main breaks over the past several years. The Mid-Peninsula Water District (MPWD) replaced a 320 LF section from Belle Monti Avenue to Coronet Boulevard in recent years. The upcoming project will replace the remaining sections of water main between Cipriani Boulevard and Arbor Avenue with new 8 inch ductile iron pipe (DIP), eliminating the 6 inch and 8 inch aged pipe along this road. This project is identified among the highest priority projects within the MPWD’s Capital Improvement Program developed in 2015 after extensive water hydraulic modeling of the entire MPWD system. MPWD’s total estimated cost for this project is budgeted at $750,000, including engineering design, project management, and construction. It will be funded with ratepayer revenues in Fiscal Years 2015/2016 and 2016/2017.

View PDF »


Alameda de las Pulgas Water Main Replacement Detour Maps

Click on the link to view the road closure detour maps.

View PDF »